Meeting Minutes [0]

About 2 mindocs

Sept 20th: AR Animal ID [0]

Info

Date:  Wed, S20-23
Time: 9:20-9:40am
TA directed

Attendance

  • Tony Shi
  • Pada Mayer
  • Jiemin Wang
  • Georgin Maliakal
  • Daniel Asimiakwini -> Product Manager
  • Ahmed Zihan Hossain -> Scrum Master
  • Yazeed Mahmoud (TA)

Agenda

  1. Project Overview
  2. Sprint 1: Project Documentation
  3. Sprint 1 Requirements and Deliverables
    • Project Storage
    • Project Requirements
    • Software Design
    • Teamwork
  4. First Meetings' Times
  5. Scrum Master & Product Manager
  6. Q & A

Notes

  • Project divided into 5 Sprints

  • Sprint 1 has 5 major components

    1. Determine the Projection Description: Understanding the end goals of the Project from the Clients perspective.
    2. Use Project Description to outline a Design plan.
    3. Setup Up All Documentation, will build on it throughout project
    4. Determine plan for Entire Project: Splitting work between the 5 Sprints + extraTam management tasks
    5. Describe the Team.
  • Sprint 1 Requirements

    1. Project Storage: All Documentation will be through GitHub Classroom

      • Will be initially setup by Yazeed. The team will build on and maintain the project’s GitHub
    2. Project Requirements: What does the Client want, what is the product

      • Exec Summary- Draft finished
        • 1 Paragraph
        • Project Description
        • The problem product addresses and solves
        • Value Proposition: Essential Functionality of Product. Why choose this product
        • Who will use product?
        • How will they use product?
      • Glossary(Domain Specific)
      • Getting User Stories - Done (maybe)
      • Similar Products
      • Open Source Products(Can Use other already done work/ideas)
      • Technical Resources(All Software Used/Plan to Use and for what)
    3. Software Design: How Design delivers Features and Requirements

      • High Level Architecture
        -Non Formal
        -Visually Explains Design plan
        -Legend
        -Includes All LAYERS x4
        - Presentation
        - Business
        - Product
        - Database
      • Major Data Elements
        • UML Class or ER
      • Interaction Scenarios
        • UML Sequence
      • Low-Fidelity UI -
        • MockUp Design
        • Some Pages/Screens
        • Look and Feel->UI UX
        • Ignore specific pictures, colours details, etc
    4. Project Management(x2)

      • Story Map(Visual-> Sprints By Categories + include US prioritized and their points)
      • Product Backlog: US to GitHub Issues(Points included) A little ambiguous if should be on GitHub or be a separate doc
      • GitHub Issues(see Product Baklog)
      • ALL SPRINTS x5
        • Due Date: Sprint 1-> OCT 2
        • Scrum Roles(Different Pair each Sprint, Everyone must be at least 1 throughout Project OR Stay same throughout)
          • Scrum Master
          • Product Manager
        • List of US
          • By Priority
          • Include FIbonacci No for difficulty
        • List of Tasks to be Completed
        • Assigned List of Tasks to team
          • Est Due date of tasks
        • Estimated Sprint Velocity->sum(US FibNo)
      • No US completion for S1, only generation
    5. Teamwork

      • Team Canvas->Assigning Project Roles Documentation
        • Will use website on eclass
      • Belbin Team Roles
        • Each member gives 3 lists
          • Preferred
          • Manageable
          • Least Preferred
        • Describe All 9 roles
        • Assign People to the 9 roles(can be many to 1 and/or 1 to many)
  • A Scrum Master and Project Manager must be selected for each Sprint

    1. Scrum Master: Zihan
    2. Product Manager: Daniel

Action Items

NameValue
PadaNone
DanielNone
GeorginNone
AhmedNone
JieminNone
TonyNone