Meeting Minutes [0]
About 2 mindocs
Sept 20th: AR Animal ID [0]
Info
Date: Wed, S20-23
Time: 9:20-9:40am
TA directed
Attendance
- Tony Shi
- Pada Mayer
- Jiemin Wang
- Georgin Maliakal
- Daniel Asimiakwini -> Product Manager
- Ahmed Zihan Hossain -> Scrum Master
- Yazeed Mahmoud (TA)
Agenda
- Project Overview
- Sprint 1: Project Documentation
- Sprint 1 Requirements and Deliverables
- Project Storage
- Project Requirements
- Software Design
- Teamwork
- First Meetings' Times
- Scrum Master & Product Manager
- Q & A
Notes
Project divided into 5 Sprints
Sprint 1 has 5 major components
- Determine the Projection Description: Understanding the end goals of the Project from the Clients perspective.
- Use Project Description to outline a Design plan.
- Setup Up All Documentation, will build on it throughout project
- Determine plan for Entire Project: Splitting work between the 5 Sprints + extraTam management tasks
- Describe the Team.
Sprint 1 Requirements
Project Storage: All Documentation will be through GitHub Classroom
- Will be initially setup by Yazeed. The team will build on and maintain the project’s GitHub
Project Requirements: What does the Client want, what is the product
- Exec Summary- Draft finished
- 1 Paragraph
- Project Description
- The problem product addresses and solves
- Value Proposition: Essential Functionality of Product. Why choose this product
- Who will use product?
- How will they use product?
- Glossary(Domain Specific)
- Getting User Stories - Done (maybe)
- Similar Products
- Open Source Products(Can Use other already done work/ideas)
- Technical Resources(All Software Used/Plan to Use and for what)
- Exec Summary- Draft finished
Software Design: How Design delivers Features and Requirements
- High Level Architecture
-Non Formal
-Visually Explains Design plan
-Legend
-Includes All LAYERS x4
- Presentation
- Business
- Product
- Database - Major Data Elements
- UML Class or ER
- Interaction Scenarios
- UML Sequence
- Low-Fidelity UI -
- MockUp Design
- Some Pages/Screens
- Look and Feel->UI UX
- Ignore specific pictures, colours details, etc
- High Level Architecture
Project Management(x2)
- Story Map(Visual-> Sprints By Categories + include US prioritized and their points)
- Product Backlog: US to GitHub Issues(Points included) A little ambiguous if should be on GitHub or be a separate doc
- GitHub Issues(see Product Baklog)
- ALL SPRINTS x5
- Due Date: Sprint 1-> OCT 2
- Scrum Roles(Different Pair each Sprint, Everyone must be at least 1 throughout Project OR Stay same throughout)
- Scrum Master
- Product Manager
- List of US
- By Priority
- Include FIbonacci No for difficulty
- List of Tasks to be Completed
- Assigned List of Tasks to team
- Est Due date of tasks
- Estimated Sprint Velocity->sum(US FibNo)
- No US completion for S1, only generation
Teamwork
- Team Canvas->Assigning Project Roles Documentation
- Will use website on eclass
- Belbin Team Roles
- Each member gives 3 lists
- Preferred
- Manageable
- Least Preferred
- Describe All 9 roles
- Assign People to the 9 roles(can be many to 1 and/or 1 to many)
- Each member gives 3 lists
- Team Canvas->Assigning Project Roles Documentation
A Scrum Master and Project Manager must be selected for each Sprint
- Scrum Master: Zihan
- Product Manager: Daniel
Action Items
Name | Value |
---|---|
Pada | None |
Daniel | None |
Georgin | None |
Ahmed | None |
Jiemin | None |
Tony | None |