This page provides an overview of the roles and the assigned tasks during the five sprints

Story Map

ACS-Checkin Story Map

Project Plan

Sprint 1

Due: February 5th, 2024

Scrum roles:

Scrum Master: Sebastian

Product manager: Martin

Tasks:

Task Related US Assignee Due
Teamwork Documentation Everyone Feb 4th
Project requirements Documentation Aaron, Seb Feb 4th
Software design Documentation Martin, Michael Feb 4th
Project Management Documentation Kristina, Bao Feb 5th

Sprint 2

Due: Feb 26th, 2024

Scrum roles:

Scrum Master: Sebastian

Product manager: Martin

User stories:

User Story Story points
SETUP - set up the dev environment 3
Testing - Set up tests for the code 4
US 1.01 - General Information About User 8
US 1.02 - Site impressions 5
US 1.03 - Visit to Protected Area Details 5
US 1.04 - Info about Services at the Site and Biological Observations 5
US 1.05 - Information about human disturbances 5
US 1.06 - Information about work to be done 5
US 1.11 - SAPAA Branding 1

Estimated sprint velocity: 41

Tasks:

Task Related US Assignee Due
Set up the dev environment SETUP Martin Feb 15th
Set up tests for the code Testing Kristina Feb 26th
General Information About User US 1.01 Bao, Michael Feb 22th
Site impressions US 1.02 Bao Feb 22th
Visit to Protected Area Details US 1.03 Bao Feb 22th
Info about Services at the Site and Biological Observations US 1.04 Bao Feb 22th
Information about human disturbances US 1.05 Bao Feb 23th
Information about work to be done US 1.06 Bao Feb 23th
SAPAA Branding US 1.11 Seb Feb 23th

Sprint 3

Due: Mar 11th, 2024

Scrum roles:

Scrum Master: Sebastian

Product manager: Martin

User stories:

User Story Story points
US 1.07 - Media Submission with Report 5
US 1.10 - Input Non-Text Information Efficiently 2
US 1.13 - Automatic location 5
US 1.15 - Reminder to Crop Image 2
US 2.01 - Toolbox Safety Check before Submitting Form 8
US 2.02 - Toolbox Safety Check Completion in <90 Seconds 2
US 3.01 - Export data as csv 3

Estimated sprint velocity: 30

Tasks:

Task Related US Assignee Due
Media Submission with Report US 1.07 Seb Mar 4th
Set up tests for the code Testing Kristina Mar 10th
Input Non-Text Information Efficiently US 1.10 Kristina Mar 1st
Automatic location US 1.13 Bao Mar 9th
Reminder to Crop Image US 1.15 Seb Mar 5th
Toolbox Safety Check before Submitting Form US 2.01 Bao Mar 5th
Toolbox Safety Check Completion in <90 Seconds US 2.02 Seb Mar 6th
Export data as csv US 3.01 Aaron Mar 2nd

Sprint 4

Due: Mar 25th, 2024

Scrum roles

Scrum Master: Sebastian

Product manager: Martin

User stories:

User Story Story points
US 4.93 - Figure out how to do background Location tracking 3
US 4.92 - Fix the continue button on IOS 3
US 4.90 - Cant submit form without filling OHS 5
US 4.80 - Build Login Page and Register Page + Firebase Integration 8
US 4.20 - Having the tests ready to run with the click of a button 5
US 3.01 - Export Data to Google Sheets 8
US 4.50 - Refactoring to use components 3
US 4.60 - Delete locations stored in local storage on Form submission 3
US 1.07 - Media Submission with Report 5
US 4.70 - Build Personal Information Page 3

Tasks:

Task Related US Assignee Due
Figure out how to do background Location tracking US 4.93 Bao Mar 25th
Fix the continue button on IOS US 4.92 Michael Mar 20th
Cant submit form without filling OHS US 4.9 Kristina Mar 21st
Build Login Page and Register Page + Firebase Integration US 4.8 Martin Mar 23th
Having the tests ready to run with the click of a button US 4.2 Kristina Mar 25th
Export Data to Google Sheets US 3.01 Aaron Mar 25th
Refactoring to use components US 4.5 Bao Mar 22th
Delete locations stored in local storage on Form submission US 4.6 Bao Mar 22nd
Media Submission with Report US 1.07 Seb Mar 21th
Build Personal Information Page US 4.7 Michael Mar 19th

Sprint 5

Due: April 8th, 2024

Scrum roles:

Scrum Master: Sebastian

Product manager: Martin

User stories:

User Story Story points
US 1.12 - Integrated Text/Video Help 5
US 1.18 - Selection and Flagging of Multiple Videos for Transmission 3
US 4.01 - Achievements 8
US 1.20 - Remember User Info 8
Presentation - Work on presentation material 4
DOCS - work on project documentation 4

Estimated sprint velocity: 32

Tasks:

Task Related US Assignee Due
Integrated Text/Video Help US 1.12 Kristina April 4th
Selection and Flagging of Multiple Videos for Transmission US 1.18 Michael April 1
Achievements US 4.01 Seb April 3rd
Remember User Info US 1.20 Martin April 4th
Work on presentation material Presentation Bao April 4th
work on project documentation DOCS Aaron April 4th